Comprehensive Playground Design & Development Process
Guangdong Dream Catch Recreation Equipment Co., Ltd. has a unique and specific design process, which is always identical, regardless of the project: an FEC, a trampoline park, or an indoor playground.
Talk to a Playground ExpertFast Installation
and Delivery to all regions worldwide
100% Customizable
to maximize business value per square meter
24/7 Support
to provide full and continuous customer support
Numerous Design Options
12-Hour / 2D Design & 36-Hour / 3D Design
Turnkey Solutions Worldwide
Safe, Durable, and Fun Indoor Play Areas For Children
Build a custom playground just for you!
For Dream Catch, “design refers to what a playstructure looks like as much as it does to the play value built into it. We simply cannot design one without the other. One good reason: Play value is what creates return visitors. Integrated play opportunities ensure that there are always multiple options for a child’s next move. Inclusive playspaces encourage children of all abilities to play alongside one another. That’s why Guangdong Dream Catch Recreation Equipment Co., Ltd. designs play environments to be newly fresh and exciting upon every visit. Children enjoy a hive of activity that sparks the imagination, facilitates discovery and lends itself to new adventure.
6 Benefits of Playground Design With Dream Catch
Design for Family Entertainment Centers, Trampoline Parks & Indoor Playgrounds – We offer a wide range of services to help you get the most out of your indoor playground, including design consultation, project management, and installation. Our team will work closely with you to ensure that your indoor playground is designed and installed according to your specific needs and requirements. If you’re looking for an indoor playground that is safe, reliable, and affordable, contact us today for a free consultation. We would be happy to answer any questions that you may have.
Space Limitations
We excel in optimizing play areas within limited or unconventional spaces, ensuring every inch is utilized efficiently.
Budget Constraints
We are adept at delivering durable playgrounds within financial constraints, without compromising on quality.
Customization Needs
Tailoring playgrounds to reflect specific themes or incorporate distinctive features as requested by our clients is our specialty.
Safety Regulations
We ensure that every playground meets relevant safety standards, providing a secure environment for children to play.
Cost-Effective Materials
We select materials and design approaches that provide durability and value, ensuring our playgrounds stand the test of time.
Inclusive Play Areas
Our playgrounds are designed for children with various abilities, promoting an inclusive play environment.
8-step Design & Development Process
Our design team is a diverse and talented lot. Not only do they bring their unique perspective to every project, but each designer is also a Safety Inspector. Which means, they’re not only designing for aesthetics and fun, but also with safety in mind. From playground designers to custom designers, conceptors to sculptors and artists, Guangdong Dream Catch Recreation Equipment Co., Ltd. will help you create one-of-a-kind playgrounds that become a source of community pride.
1. Advice & Conversation: The Consultative Phase
“We start a conversation about your project.” – Every successful project begins with a dialogue. Regardless of whether the project is a massive FEC, a trampoline park, or a soft-play area, Dream Catch involves experienced designers immediately. This ensures that the client’s vision is technically feasible from day one.
Industry Insight & Expansion are critical for establishing the Project Feasibility Study.
- Target Demographic Analysis: We determine who your customers are (e.g., toddlers, teenagers, or corporate team building) to tailor the attraction mix.
- Budget Alignment: Early discussions prevent “over-designing.” We align your financial constraints with realistic equipment expectations.
- Unique Selling Proposition (USP): We discuss what will make your park different from competitors in your region, setting the stage for a custom design rather than a cookie-cutter solution.
2. Delivery of Building Plan & Site Assessment
“Delivery of the building plan to assess the length and height available.” – Before drawing a single line, the technical team requires detailed building plans (DWG/CAD files). This step is non-negotiable because the physical constraints of the building dictate the equipment selection.
- Verticality is Key: In the amusement industry, ceiling height is as valuable as floor space. High ceilings allow for multi-level structures, high-ropes courses, and slides, which drastically increase player capacity per square meter.
- Obstacle Mapping: We analyze the plan for structural columns, HVAC ducting, fire exits, and load-bearing walls.
- Safety Compliance: We ensure the available space allows for required safety setbacks and emergency egress routes in accordance with international safety standards (ASTM/EN).
3. Creation of Layout Concept (2D Footprint)
“Creation of layout concept, complete 2D footprint.” – The team conducts a brainstorming session to produce a “Layout Concept.” This 2D map places play structures alongside vital infrastructure (reception, café, restrooms, staff areas).
- Traffic Flow Management: A good layout isn’t just about fitting equipment in; it’s about controlling the flow of people to prevent bottlenecks.
- Zoning Strategy: We strategically separate high-energy zones (trampolines/ninja courses) from low-energy zones (toddler areas/cafés) to ensure safety and comfort for all ages.
- Revenue Optimization: The layout is designed to maximize “dwell time.” By placing sitting areas and cafés with clear sightlines to play zones, parents stay longer, increasing food and beverage revenue.
4. Integration of Interior Design (Theming & Atmosphere)
“Integration of interior design elements (optional).” – Clients can opt for a turnkey solution where Dream Catch handles lighting, sound, decoration, wall art (graffiti/spray painting), and furniture. This creates the “WOW” factor.
- Immersive Experience: In modern FECs, customers pay for the experience, not just the equipment. Theming (e.g., Jungle, Space, Cyberpunk) creates an immersive environment that justifies higher ticket prices.
- Sensory Branding: Integrated sound systems and dynamic lighting (intelligent LEDs) control the energy of the room—pumping up the energy during peak hours and calming it down during low traffic or sensory-friendly sessions.
- Brand Identity: Custom decoration helps establish your brand identity, making your location Instagram-mable and shareable on social media.
5. Validation of 2D Investor Approval
All elements (play gear, infrastructure, decor) are consolidated into a final 2D blueprint. This serves as the master plan that must be approved by the investor before moving to costly 3D rendering.
- Throughput Calculation: At this stage, we can calculate the “Theoretical Hourly Capacity” (THC) of the park to ensure the design can handle your projected visitor numbers.
- Operational Review: This is the moment to check operational logic—is the party room close enough to the kitchen? Is the check-in desk large enough for weekend queues?
- Scope Freeze: validating the 2D plan locks in the scope, preventing “scope creep” and keeping the project on timeline and budget.
6. Creation of 3D Rendering (Clay Model)
“Creation of 3D Rendering without colors.” – The team creates a “Clay Model”—a colorless 3D rendering. This allows the client to “fly through” the facility and understand the volume and scale of the structures without being distracted by colors or textures. Pricing is also supplied/refined here.
- Spatial Awareness: 2D plans can be deceptive. A colorless 3D model reveals sightlines (e.g., can staff see the back of the climbing wall?) and density (does the park feel too empty or too crowded?).
- Structural Integrity: This stage verifies that the different attractions fit together physically in three dimensions without clashing.
7. Validation of 3D Rendering (Full Color)
“Creation of 3D Rendering without colors.” – The team creates a “Clay Model”—a colorless 3D rendering. This allows the client to “fly through” the facility and understand the volume and scale of the structures without being distracted by colors or textures. Pricing is also supplied/refined here.
- Spatial Awareness: 2D plans can be deceptive. A colorless 3D model reveals sightlines (e.g., can staff see the back of the climbing wall?) and density (does the park feel too empty or too crowded?).
- Structural Integrity: This stage verifies that the different attractions fit together physically in three dimensions without clashing.
8. Extra Options: 360° Virtual Tour / Video
“Extra promotional tool: 360° virtual tour.” – For an additional fee, Dream Catch creates a virtual reality tour or video walkthrough of the unbuilt park.
- Pre-Selling Tickets: A high-quality video walkthrough allows owners to sell memberships and book birthday parties months before the facility actually opens.
- Contractor Guidance: The 360° tour can be shared with local general contractors (electricians, painters) to help them understand exactly what the finished environment should look like, reducing installation errors.
- Investor Confidence: For clients seeking bank loans or external partners, a VR tour provides the highest level of proof-of-concept, significantly increasing the chances of securing funding.
Work with Dream Catch
At Guangdong Dream Catch Recreation Equipment Co., Ltd., we are always aware of the entertainment industry’s rapidly changing market. It’s no secret that times change and so do customers’ tastes. Attractions that were hot a few years back are now outdated. For this reason, whether we’re starting from scratch to develop a new venue or renovating an existing one, our trademark is to assist our clients in creating a singular design and brand for a family entertainment center that stands out from the rest.